JCS1200 Clearance Requirements for Airflow and Hardware
Maintenance
When planning the installation site, allow sufficient
clearance around the rack (see Figure 1):
- For the cooling system to function properly, the airflow
around the chassis must be unrestricted.
- For service personnel to remove and install hardware components,
there must be adequate space at the front and back of the platform.
Allow at least 30 in. (72.6 cm) in front of the rack
and 24 in. (61.0 cm) behind the rack.
- Airflow vents provided along the sides of the chassis
must remain open and uncovered for proper cooling.
Figure 1: JCS1200 Chassis Dimensions and
Clearance Requirements
Published: 2011-12-15