Installation Overview for the SRX650 Services Gateway
After you have prepared the site for installation
and unpacked the SRX650 Services Gateway, you are ready to install
the device. It is important to proceed through the installation process
in the following order:
- Review the safety guidelines explained in General Electrical Safety Guidelines and Warnings.
- Prepare the services gateway for installation as
described in Preparing the SRX650 Services Gateway for Rack-Mount Installation.
- Install the services gateway as described in Installing the SRX650 Services Gateway in a Rack.
- Connect cables to external devices.
- Connect the grounding cable as described in Grounding the SRX650 Services Gateway.
- Power on the services gateway as described in Powering On the SRX650 Services Gateway.
Published: 2010-12-01