SRX5600 Services Gateway Component Redundancy
The following
major hardware components are redundant:
- SCBs—The host subsystem consists of a Routing Engine
installed in an SCB. The device must have one host subsystem installed.
You can install a second SCB for redundancy. If a second SCB is installed,
the host subsystem SCB functions as the master and the other functions
as the backup. If the SCB of the host subsystem fails, the other SCB
takes over as the master.
- Power supplies—In the low-line (110 V) AC power
configuration, the device contains three or four AC power supplies,
located horizontally at the rear of the chassis in slots PEM0 through PEM3 (left to right). Each AC power supply provides
power to all components in the device. When three power supplies are
present, they share power almost equally within a fully populated
system. Four AC power supplies provide full power redundancy. If one
power supply fails or is removed, the remaining power supplies instantly
assume the entire electrical load without interruption. Three power
supplies provide the maximum configuration with full power for as
long as the device is operational.
In the high-line (220 V) AC power configuration, the device
contains two or four AC power supplies located horizontally at the
rear of the chassis in slots PEM0 through PEM3 (left
to right). Each AC power supply provides power to all components in
the device. When two or more power supplies are present, they share
power almost equally within a fully populated system. Four AC power
supplies provide full power redundancy. If one power supply fails
or is removed, the remaining power supplies instantly assume the entire
electrical load without interruption. Two power supplies provide the
maximum configuration with full power for as long as the device is
operational.
In the DC configuration, two power supplies are required to
supply power to a fully configured device. One power supply supports
approximately half of the components in the device, and the other
power supply supports the remaining components. The addition of two
power supplies provides full power redundancy. If one power supply
fails or is removed, the remaining power supplies instantly assume
the entire electrical load without interruption. Two power supplies
provide the maximum configuration with full power for as long as the
device is operational.
- Cooling system—The cooling system has redundant
components, which are controlled by the host subsystem. If one of
the fans fails, the host subsystem increases the speed of the remaining
fans to provide sufficient cooling for the services gateway indefinitely.
Published: 2011-03-29