Juniper Networks
Log in
|
How to Buy
|
Contact Us
|
United States (Change)
Choose Country
Close

Choose Country

North America

  • United States

Europe

  • Deutschland - Germany
  • España - Spain
  • France
  • Italia - Italy
  • Россия - Russia
  • United Kingdom

Asia Pacific

  • Asean Region (Vietnam, Indonesia, Singapore, Malaysia)
  • Australia
  • 中国 - China
  • India
  • 日本 - Japan
  • 대한민국 - Korea
  • 台灣 - Taiwan
Solutions
Products & Services
Company
Partners
Support
Education
Community
Security Intelligence Center

Technical Documentation

Support
Technical Documentation
Content Explorer New
 
Enterprise MIBs
 
EOL Documentation
 
File Format Help
 
Glossary
 
Portable Libraries
 
 
Home > Support > Technical Documentation > JCS 1200 Platform > JCS 1200 Hardware > JCS1200 Platform Power Overview
Print
Rate and give feedback:  Feedback Received. Thank You!
Rate and give feedback: 
Close
This document helped resolve my issue.  Yes No

Additional Comments

800 characters remaining

May we contact you if necessary?

Name:  
E-mail: 
Submitting...
 

Related Documentation

  • JCS 1200
  • Connecting the JCS1200 AC Platform to AC Power
  • Connecting the JCS1200 DC Platform to DC Power
 

JCS1200 Platform Power Overview

The JCS1200 platform does not have a power switch. The platform has four power connectors; each powers a power module. As viewed from the rear of the JCS1200 platform, power connector 1 (top-right connector) supplies power to power module bay 1, power connector 2 (bottom-left connector) supplies power to power module 2, power connector 3 (top-left connector) supplies power to power module 3, and power connector 4 (bottom-right connector) supplies power to power module 4 (see Figure 1).

Figure 1: Direction of Power from Power Connectors to Power Modules on the JCS1200 Platform

Direction of Power from
Power Connectors to Power Modules on the JCS1200 Platform

Power modules 1 and 2 are redundant and provide power to Routing Engine bays 1 through 6; power modules 3 and 4 are redundant and provide power to Routing Engine bays 7 through 12. To ensure power redundancy, a typical power configuration is to supply power to power connectors 1 and 4 from one power source location while supplying power to power connectors 2 and 3 from another power source location. The power domains are shown in Figure 2.

Figure 2: Logical View of Power Domains on the JCS1200 Platform

Logical View of Power Domains
on the JCS1200 Platform

Note: The release handles on the fan shuttle have a safety switch that disables power output from the power boxes. If the release handles are not secured to the chassis with the thumbscrews, the JCS1200 platform will not power on.

 

Related Documentation

  • JCS 1200
  • Connecting the JCS1200 AC Platform to AC Power
  • Connecting the JCS1200 DC Platform to DC Power
 

Published: 2011-12-15

 
  • About Juniper
  • The New Network
  • Investor Relations
  • Press Releases
  • Newsletters
  • Juniper Offices
  • Resources
  • How to Buy
  • Partner Locator
  • Image Library
  • Visio Templates
  • Security Center
  • Community
  • Forums
  • Blogs
  • Junos Central
  • Social Media
  • Support
  • Technical Documentation
  • Knowledge Base (KB)
  • Software Downloads
  • Product Licensing
  • Contact Support
Site Map / RSS Feeds / Careers / Accessibility / Feedback / Privacy & Policy / Legal Notices
Copyright© 1999-2012 Juniper Networks, Inc. All rights reserved.
Help
|
My Account
|
Log Out