Table 18 provides links and commands for using loopback testing to isolate T3 interface problems.
provides commands for using loopback testing for T3 interfaces.
Table 18: Checklist for Using Loopback Testing for T3 Interfaces
Tasks |
Command or Action |
|---|---|
Connect the transmit port to the receive port. |
|
[edit interfaces
interface-name t3-options] |
|
[edit interfaces
interface-name] |
|
show interfaces t3-fpc/pic/port |
|
clear interfaces statistics t3-fpc/pic/port |
|
[edit interfaces
interface-name] |
|
[edit interfaces
interface-name] |
|
show interfaces t3-fpc/pic/port |
|
ping interface t3-fpc/pic/port local-IP-address bypass-routing count 1000 rapid |
|
show interfaces t3-fpc/pic/port extensive |
|
| Diagnose a Suspected Circuit Problem | |
[edit interfaces
interface-name t3-options] |
|