Product FRS Date End of Engineering Support End of Life (EOL)
IDP 4.2 05/20/2008 11/20/2009* 11/20/2010
IDP 4.1 03/12/2007 09/12/2008* 09/12/2009*
IDP 4.0 05/23/2006 11/23/2007* 11/23/2008*
IDP 3.2**** 09/19/2005 11/15/2007* 11/15/2008*
IDP 3.1 05/23/2005 11/23/2006* 11/23/2007*
IDP 3.0 03/15/2004 09/15/2005 12/15/2006***
IDP 2.1 2003 03/13/2006 09/15/2006**
IDP 2.0 2002 05/2004 11/2004
IDP 1.6 2001 07/2003 07/2004
IDP 1.5 2001 07/2003 07/2004

For IDP software products, the period of active engineering support will be the current release plus two (2) subsequent releases, or up to eighteen (18) months from the FRS date, whichever occurs first. All software releases are considered major.

Update releases (e.g. service, maintenance, patch) will no longer be created for major software releases after the end of engineering (EOE) date. IDP attack object (signature) updates will be provided until the EOL.

JTAC support will continue after EOE for two (2) subsequent releases or up to twelve (12) months, whichever occurs first. After EOE and until EOL JTAC support will be generally limited to investigation and troubleshooting in an attempt to provide solutions and workarounds. IDP attack object (signature) updates will be provided until EOL is reached.

Prior to IDP 2.1, EOE and EOL dates were the same, Juniper provided engineering support until EOL was reached and provided more than the up to eighteen (18) months of support noted above.

When the release reaches EOL the software images are removed from www.juniper.net and JTAC will only provide support on a commercially reasonable effort basis.

* No later than the date posted, the date may be earlier if the subsequent releases are reached prior to the months of support option.

** IDP 2.1 EOL date, for this release only, has been extended to eighteen (18) months after the EOE date.

*** IDP 3.0 EOL date, for this release only, has been extended to fifteen (15) months after the EOE date.